It’d been 30 years without a touch. Let me just say it needed to be updated pretty darned bad. You can use some of these original pictures as a guide to help you determine whether or not the overhaul was warranted:
[cg_gallery 11473 144] |
[cg_gallery 11474 144] |
[cg_gallery 11475 217] |
[cg_gallery 11478 144] |
So, Greg decided to plan everything out, and Jill and I joined him for a fun-filled 5 days of overhaul. Let me say it wasn’t the funnest 5 days I’ve ever had, but in the end the result was worth the work. So here we go, the demo:
[cg_gallery 11481 164] |
[cg_gallery 11483 164] |
[cg_gallery 11484 164] |
[cg_gallery 11487 164] |
[cg_gallery 11495 164] |
[cg_gallery 11500 164] |
[cg_gallery 11506 164] |
[cg_gallery 11510 164] |
[cg_gallery 11514 246] |
[cg_gallery 11516 164] |
[cg_gallery 11519 164] |
With the demo completed, it was now time to start putting everything back together. Considering demo only took 4 hours, we were on a good schedule. Unfortunately, the vast majority of the work encompassed putting things back together…. 🙂
First, the plumbing, electrical, framing, drywall and painting.
[cg_gallery 11531 246] |
[cg_gallery 11532 164] |
[cg_gallery 11563 106] [cg_gallery 11568 106] |
[cg_gallery 11575 246] |
[cg_gallery 11622 164] |
[cg_gallery 11625 164] |
[cg_gallery 11632 246] |
[cg_gallery 11635 246] |
Next comes the tile:
[cg_gallery 11641 164] |
[cg_gallery 11642 164] |
[cg_gallery 11644 246] |
[cg_gallery 11646 164] |
[cg_gallery 11647 164] |
[cg_gallery 11648 164] |
And then the finishing touches with the floor tile, toilet and sink base cabinets.
[cg_gallery 11650 164] |
[cg_gallery 11651 164] |
[cg_gallery 11654 164] |
[cg_gallery 11655 164] |
[cg_gallery 11658 164] |
[cg_gallery 11660 164] |
[cg_gallery 11661 164] |
[cg_gallery 11662 164] |
And the final product, apples and oranges compared to the original:
[cg_gallery 11663 350] |
[cg_gallery 11664 350] |
[cg_gallery 11665 350] |
[cg_gallery 11668 350] |